WC1-NN-001 — Agreed ventilation direction: Use the existing window or natural-ventilation opening together with a normal small toilet ceiling-mounted circulation fan. Do not provide a ducted mechanical exhaust or extraction system. Select a moisture-suitable fan and coordinate safe electrical provision, airflow and maintenance access; any window enlargement remains subject to HDB approval.
WC1-NN-002 — Drainage and water containment: Provide proper floor falls and drainage throughout. No ponding may occur, and water must not escape into the main bedroom under normal use or drainage-fault conditions.
WC1-NN-003 — Agreed kerb-free entrance with internal shower containment permitted: Provide a completely flush, kerb-free transition between the main bedroom and WC1. An internal shower kerb or dropped shower zone is acceptable. Detail any internal level transition for safe use and coordinate it with floor falls, waterproofing, drainage, shower separation and full water containment.
WC1-NN-004 — Full waterproofing: Completely renew the waterproofing system and test it properly before finishes are applied.
WC1-NN-005 — Pipe inspection and replacement: Inspect existing water, waste and concealed pipes and replace defective or unsuitable sections rather than covering or patching them.
WC1-NN-006 — Accessible pipe boxing: Box exposed pipework neatly while retaining removable access to maintainable joints, valves, traps and future HIP works without full demolition.
WC1-NN-007 — Mould remediation: Inspect and properly treat existing mould and moisture-damaged surfaces before applying new finishes.
WC1-NN-008 — AC condensate routing: Route condensate deliberately to an appropriate drain without crossing or wetting the floor, causing ponding, obstructing the floor trap or producing audible dripping. Coordinate gradient, termination and access between the ID, bathroom contractor, plumber and AC contractor, and test all relevant AC units before handover.
WC1-NN-009 — Spacious circulation: Provide comfortable movement and avoid an oversized vanity. When space trade-offs are unavoidable, Fahmi's attributed order is shower space, circulation, vanity/countertop and then additional storage.
WC1-NN-010 — Right-sized storage: Provide adequate storage for daily bathroom use without crowding the room.
WC1-NN-011 — Mould-resistant surfaces: Design the ceiling, flooring, grout lines, silicone and other joints to resist mould and remain inspectable and maintainable. Minimise grout lines and dirt traps.
WC1-NN-012 — Agreed integrated vanity direction: Use a joint-minimised integrated sink and countertop that resists stains, scratches, moisture and normal bathroom chemicals. Ceramic remains a performance reference, and the ID may demonstrate aesthetically suitable alternatives that meet the same criteria.
WC1-NN-013 — Agreed shower fittings: Provide both a rain shower and a handheld shower in the shower zone.
WC1-NN-018 — Agreed wet/dry zoning: Provide genuine separation so the dry vanity and entry zone remains usable while the shower is occupied.
WC1-NN-019 — Agreed toilet type: Provide a conventional floor-mounted toilet.
WC1-NN-020 — Fahmi: Provide bathroom-safe vanity power and charging for electric toothbrushes and shavers, with suitable load and placement for hair-dryer use.
WC1-NN-058 — Agreed: Install an electronic bidet seat or washlet during the renovation. Select a model that minimises difficult-to-clean recesses and detachable or inaccessible parts, and demonstrate practical cleaning, electronic reliability, repair access, warranty, servicing and spare-parts support.